11. Funding a program must be timely so that the contractor doesn’t have to keep running to the bank to support government projects.(一次给足钱)

  12. There must be mutual trust between the military project organization and the contractor with very close cooperation and liaison on a day-to-day basis. This cuts down misunderstanding and correspondence to an absolute minimum. (军方和承包商互相信任,紧密接触)

  13. Access by outsiders to the project and its personnel must be strictly controlled by appropriate security measures.(注意机密)

  14. Because only a few people will be used in engineering and most other areas, ways must be provided to reward good performance by pay not based on the number of personnel supervised.(奖励,激励)

  下面这些照片记录的“臭鼬”工厂的一些著名人物和机型。

克拉伦斯·“凯利”·约翰逊与他的团队在143天内设计制造了XP-80原型机,并交付美国陆航。之后他创立了“臭鼬”工厂,约翰逊的14条使得“臭鼬”工厂在70年中不断取得成功

年轻的凯利与P-80模型

“臭鼬”工厂起步于加州伯班克洛克希德工厂内的一个木头帆布棚子里。这是唯一一张拍摄到“臭鼬”工厂简陋棚子的照片,前景是P-80“流星”战斗机的机鼻部分

XP-80“LuLu美女”号,是后来1732架“流星”的原型机。P-80被设计用来对抗二战中出现的德国喷气式战斗机,该机证明了自身是成功的战斗机,在朝鲜战争中获得了喷气式战斗机之间空战的首次胜利

F-104采用独特的非常薄的梯形翼是为了实现高马赫数的同时兼顾低速稳定性和操控性。被称为“人操导弹”的F-104“星际战斗机”是第一种2马赫战斗机。图中这架XF-104原型机于1954年首飞,除美国空军外,还有14个国际用户操作过该机。意大利的F-104参加了1991年的“沙漠风暴”行动,2004年意大利的F-104才退役

秘密研制的U-2高空侦察机是为侦察苏联而生的。U-2在50多年来一直被不断改进,1955年8月首飞的U-2A全机无涂装并涂上了NACA的标志进行伪装

1959年8月29日洛克希德获得了正式研制A-12高空侦察机的许可。A-12主要是围绕着推进系统设计的,发动机是该机打破速度和高度世界世界纪录的关键。单座的A-12又发展出双座的SR-71和YF-12,图中是为美国空军研制的YF-12双座截击机,正在加州伯班克的秘密厂房中制造

D-21冲压动力无人战略侦察机是A-12项目的延伸。D-21被设计成从改装过的A-12载机——M-21的机背上发射,后来又改成安装火箭助推器从B-52的翼下发射。图中的D-21全尺寸模型的黑色区域代表可以减小雷达截面积的复合材料