Why Defence Ministry may fund railways projects worth almost Rs 1.4 lakh crore near India-China border
Published May 10, 2015 | By admin
SOURCE: ECONOMIC TIMES



                               
登录/注册后可看大图

11th Infantry Brigade was defendingWalong under numerous handicaps. There being no road beyond Tezu which is 230 km south. There was a severe shortage of artillery, rations, ammunition, winter clothing and defence stores at Walong.

This inscription at a war memorial in Arunachal Pradesh’s sleepy town of Walong explains why the Indian Army was forced to retreat from the eastern-most locations along the McMahon Line during the 1962 India-China war. Over five decades later, concrete roads have been built up to the border.

And, now, if the government has its way, railway tracks will be laid up to Tezu andTawang in Arunachal Pradesh and Leh in Jammu & Kashmir, thereby providing a leg up to mobility of troops and ammunition in the north-eastern state that borders China.

“The defence ministry and we have been planning to work together to bring in better [rail] connectivity to the Northeast,” railway minister Suresh Prabhu told ET Magazine in his Rail Bhawan office earlier this week.

Last month, defence minister Manohar Parrikar revealed that the Railways would set up a station in Arunachal Pradesh near the India-China border, and a memorandum of understanding (MoU) would be signed between the two ministries to execute the project. China claims Arunachal Pradesh as a part of south Tibet and objects to building of new infrastructure there. India refutes the claim as absurd.

Catching up with the Dragon

As ET Magazine has learnt, the defence ministry may fund four railway projects in the areas bordering India and China totalling a railway line of about 1,400 km that may cost up to Rs 1.4 lakh crore if a simple calculation of Rs 80 crore to Rs 100 crore per km of railway construction in hilly terrain is factored in. The costs may go up depending on the number of tunnels on the route, something that will be known only after detailed surveys and finalisation of alignments.

A railway ministry official says on the condition of anonymity that preliminary surveys have been already undertaken on four routes — Murkongselek to Rupai (both in Assam) via Pasighat, Tezu and Parasuramkund in Arunachal Pradesh; Misamari (Assam) to Tawang (Arunachal Pradesh); North Lakhimpur to Silapathar (both Assam) via the t own of Along in Arunachal Padesh; and Bilaspur (Himachal Pradesh) to Leh via Manali.

“We are expecting the ministry of defence to release about `345 crore soon for detailed investigations and finalisation of alignments,” says the official. “Money is not any constraint here. The real challenge will be to execute these projects in the Himalayas in a time-bound manner,” says another official in Rail Bhawan.

When contacted, Sitanshu Kar, principal spokesperson of the ministry of defence, said he has nothing more to add to what his minister Parrikar had said last month.

To be sure, India lags China in building infrastructure, including a rail network, on the Northeast border. An aggressive China has already inched closer to the Indian border in Sikkim when it completed building a 258-km rail line between Lhasa and Shigatse (Xigaze).

The Tibetan city of Shigatse is to the north of Sikkim. But what seems to have worried New Delhi more is China beginning surveys for a new 435 km-long railway line from Lhasa to Nyingchi, a small town bordering Arunachal Pradesh.

Monika Chansoria, senior fellow and head of the China-study programme at the Centre for Land Warfare Studies in the Capital, says New Delhi’s decision to expand the railway network to the India-China border is a welcome, albeit dilatory move.

“The already operational infrastructure on the Chinese side including rail links has added to the strategic and tactical mobility, given that the transportation capabilities of the PLA [China’s military] were rather limited until a few years back, remaining heavily reliant on ground assets, and primarily tactical in reach,” she says.

Why Defence Ministry may fund railways projects worth almost Rs 1.4 lakh crore near India-China border
China’s hyperactive infrastructure building on their side of the border has forced India to take corrective steps on its own hills.

For example, Arunachal Pradesh, the largest among the eight Northeastern states, and a state that borders Bhutan (160 km), China (1,080 km) and Myanmar (440 km), has less than 15 km of railway lines till date.

So, it’s not surprising that three out of four proposed rail projects, which are likely to be funded by the ministry of defence, will be rolled out in the strategically located Arunachal Pradesh.

One of those lines, the 378 km-long Misamari (Assam)-Tawang (Arunachal Pradesh) one, for example, will be a key line strategically, as it would cater to the mobility of the armed forces stationed at a base near Misamari (near Tezpur, Assam) that’s headed by a lieutenant general, an officer just one rank below the Army General.

Rare Alliance

This may be one of the very few times that the defence ministry is set to join hands with the Railways to lay tracks.

The last time this happened was for the Sakri-Nirmali rail line, a Rs 350-crore project in Bihar that provides an alternative route to Northeast India; the project was partly funded by the ministry of defence during the Atal Bihari Vajpayee-led NDA government.

The project included construction of a rail-cumroad bridge on the Kosi river at Nirmali, connecting Darbhanga in Bihar with New Jalpaiguri, a gateway to Assam and the Northeast. No deadline has been set as yet for the current projects.

The preliminary surveys have been undertaken and are under examination, according to railway officials looking into this matter.

“The projects are at an advanced stage, and work will formally start once an MoU is signed between the defence ministry and the railways”, says one of the officials.

Defence ministry and Railways will Work Together in Northeast: Suresh Prabhu

Suresh Prabhu, minister of railways, sheds light on the projects in the Northeast. Edited excerpts:

On rail connectivity to the Northeast

Our idea is to bring in total rail connectivity to the state capitals of the Northeast. We have progressed well in that direction. And for the first time we had an emotional connectivity and not just physical connectivity with the Northeast when we held the Railway Week there (in Guwahati in April). The Railway Week was never organised in that region before. Imagine, it has been happening for the last 70 years, but has never been held in the Northeast.

On working together with the defence ministry

The defence ministry and we have been thinking about working together to bring in even better (rail) connectivity to the Northeast. I will give details at an appropriate time. We (Railways) are already near Itanagar (the capital city of Arunachal Pradesh). We will definitely do work on our own as well as work with the ministry of defence to build a railway network in the region.

On his visits to the Northeast

(As railway minister) I have travelled to a number of places in the region. Recently, I went to Arunachal Pradesh, up to Tawang (bordering China).
分享到:  QQ好友和群QQ好友和群 QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
收藏收藏
回复

使用道具 举报

沙发
 楼主| 发表于 2015-5-10 18:10 | 只看该作者

印度陆军第11步兵旅正在无数不利条件下保卫瓦弄(Walong)。道路只到德泽(Tezu) 为止,那里位于瓦弄(Walong)以南230公里。瓦弄(Walong)严重短缺火炮,口粮,弹药,冬季服装和防护用品。

回复

使用道具 举报

板凳
发表于 2015-5-10 18:12 来自手机 | 只看该作者
兔子承揽,给回扣i,豆腐渣之
回复 支持 反对

使用道具 举报

地板
 楼主| 发表于 2015-5-10 18:15 | 只看该作者

在印度非法侵占的中国藏南地区的瓦弄的一个宁静小镇上的战争纪念碑上的这段碑文,解释了为什么印军被迫在1962年对印自卫反击战中从麦克马洪线东段大部分地方撤退。在五十年后,印度政府已经把水泥路修到了所谓的“边境"。

回复

使用道具 举报

51
 楼主| 发表于 2015-5-10 18:24 | 只看该作者

而且,现在,如果政府有办法,铁路轨道将铺设到位于印度非法侵占的中国藏南的德泽(Tezu) 和达旺(Tawang),位于查谟和克什米尔的列城(Leh),从而为部署在印度东北部中印边境的印军以及弹药补给的机动性占据优势。

回复

使用道具 举报

61
 楼主| 发表于 2015-5-10 18:30 | 只看该作者

印度铁道部长Suresh本周早些时候在他的办公室告诉经济时代杂志:“印度国防部和印度铁道部已经计划携手合作,为了实现通向印度东北部的更好的铁路”

回复

使用道具 举报

71
 楼主| 发表于 2015-5-10 18:32 | 只看该作者

上个月,印度国防部长 Parrikar透露,印度铁路将在印度非法侵占的中国藏南地区的中印边境附近新建一个火车站,同时国防部和铁道部将签署一个备忘录来执行这个项目。中国当然表示反对,但三锅置若罔闻。

回复

使用道具 举报

81
发表于 2015-5-10 18:32 | 只看该作者

瓦弄北边是察隅,tezu在传统边界线以南

回复

使用道具 举报

91
 楼主| 发表于 2015-5-10 18:39 | 只看该作者

经济时代杂志了解到,印度国防部可能为在中印实控线附近新建4个铁路总长为1400公里的项目提供220亿美元资金。如果简单计算下,考虑到丘陵地形,每公里铁路的造价8千万到1亿人民币。这个造价还可能上涨,取决于一路上隧道的数量,详细调查后才能定

回复

使用道具 举报

101
 楼主| 发表于 2015-5-10 18:47 | 只看该作者

考虑到字数,下文将印度非法侵占的中国藏南地区,简称为“藏南”。该简称不影响其政治含义。谢谢。

回复

使用道具 举报

111
 楼主| 发表于 2015-5-10 18:52 | 只看该作者

一位匿名的铁道路官员说,经过初步调查已经确认4条路线。第1条:从阿萨姆邦的Murkongselek起,经过藏南的 Pasighat、德泽Tezu和布拉马肯得湖(Parasuram Kund)到阿萨姆邦的Rupai 。

回复

使用道具 举报

121
发表于 2015-5-10 18:58 | 只看该作者

土鳖不是还有免费去勘探设计吗?

回复

使用道具 举报

131
 楼主| 发表于 2015-5-10 18:58 | 只看该作者

第2:从阿萨姆邦的米萨马里(Misamari)到中国藏南的达旺Tawang;第3:从阿萨姆邦的North Lakhimpur经过中国藏南城镇到阿萨姆的Silapathar ;第4条:从喜马偕尔邦的Bilaspur经Manali到列城Leh

回复

使用道具 举报

141
 楼主| 发表于 2015-5-10 19:05 | 只看该作者

铁道部官员说,我们希望国防部尽快支付3.4亿人民币,用于详细调查,和确定最终路线。另一位铁路公司的官员说,这项目的资金不是问题。真正的挑战将是要按时在喜马拉雅地区建成这些铁路。

回复

使用道具 举报

151
 楼主| 发表于 2015-5-10 19:10 | 只看该作者

可以肯定,印度在中印边境的基础设施建设,包括铁路网络,落后于中国。当中国完成了建设拉萨和日喀则之间的258公里铁路线,印度认为中国的交通线已经从锡金方向逼近了中印实控线。

回复

使用道具 举报

161
 楼主| 发表于 2015-5-10 19:36 | 只看该作者

日喀则位于锡金的北部。但看来更令新德里担心的是,中国开始勘察从拉萨到林芝的一条总长435公里的新铁路。林芝靠近印度非法侵占的中国藏南地区。

本帖最后由 mm6fan 于 2015-5-10 19:37 编辑

回复

使用道具 举报

171
 楼主| 发表于 2015-5-10 19:40 | 只看该作者

莫妮卡,高级研究员,是位于新德里的陆战研究中心的中国研究项目负责人,她说,新德里决定将铁路网延伸到中印边境,是一个值得欢迎的,尽管拖拉的行动。

回复

使用道具 举报

181
发表于 2015-5-10 19:48 | 只看该作者

查了下地图,都在藏南地区以南无争议丘陵地带

回复

使用道具 举报

191
 楼主| 发表于 2015-5-10 19:48 | 只看该作者

她说,中方境内已经运行的基础设施,包括铁路连接,增强了战略和战术机动性,鉴于直到几年前,解放军的运输能力(估计指空运)是相当有限的,在抵达前线时,主要采取的战术,严重依赖地面资产。

回复

使用道具 举报

201
 楼主| 发表于 2015-5-10 19:58 | 只看该作者

在4个新建铁路项目中,378公里长的从阿萨姆邦的米萨马里(Misamari)到中国藏南的达旺Tawang,将是一条关键的战略性路线。将提供驻扎在靠近Misamari附近的基地的印军更强的机动性,该部队由一名中将统帅。

在印度非法侵占的中国藏南地区,目前只有不到15公里铁路。
回复 支持 反对

使用道具 举报

Smilies [点此填写标题]
您需要登录后才可以回帖 登录 | 注册

本版积分规则

手机版|黑木崖|鼎盛网 ( 浙ICP备10200450号-3 ) 

GMT+8, 2026-10-20 05:00

Powered by Discuz! X3.1 Licensed

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表